PROJECT
PROJECT DESCRIPTION
This project focused on the design and installation of a high-capacity plant room to serve Hayle Football Club, supporting multiple showers and outlets operating simultaneously.
While not a design-led installation, the priority here was performance, reliability and efficiency. We carefully designed the system to cope with peak demand, ensuring consistent hot water supply across all facilities without pressure or temperature drop.
The plant room was installed, commissioned and tested by our engineers to meet the practical demands of a busy sports facility, delivering a robust, dependable solution built for long-term use.
DETAILS
PROJECT GALLERY





